Innovative Construction
Fibertex Phase 2, Bovis Lend Lease
(2004/2005) Nilai, Negeri Sembilan
Fire Wall
Construction 12 meters high. This wall
was a change order after the end users study indicated that the insurance
premium savings from building such a wall was very viable in the long term. Beside the speed required in this
construction, we had to contend with the high safety requirements set by the
client in this construction. We worked
with the client on what was best for them to get their product into market in
the shortest possible time. Last updated: March 2005 |